Aerial view rendering of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

B.C. VOTES 2020: We’ll build Massey bridge, B.C. Liberals say

NDP to decide on bridge or tunnel by the end of 2020

A bridge to replace the fragile, congested George Massey Tunnel under the Fraser River can be restarted soon after the Oct. 24 B.C. election, without lengthy environmental studies and a likely court challenge to the proposed twin tunnel plan, B.C. Liberal leader Andrew Wilkinson says.

Wilkinson and Richmond-Queensborough candidate Jas Johal announced at a campaign event Oct. 5 that the Massey bridge project would be part of an $8 billion infrastructure package to help B.C.’s economy recover from the COVID-19 pandemic. The cost of the bridge has risen since the NDP cancelled the project in 2017 and embarked on a study of an eight-lane tunnel option instead.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

The bridge project was halted with six kilometres of sand preload in place for the approaches and $95 million spent on assessment, design and consultation, Wilkinson said. He gave no estimate of how much the cost has risen and would only say it would be open to traffic “as soon as possible.”

“The worst possible thing you can do is to drive a great big tunnel under the river,” Wilkinson said.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

Speaking on behalf of the NDP, Delta North candidate Ravi Kahlon acknowledged that three years after cancelling the original bridge project, his government has not yet approved a design or decided between a bridge and a tunnel. That decision will come by the end of the year, he said.

RELATED: Massey crossing business study halted for snap election

RELATED: Pattullo bridge gets priority, union-only construction deal

Wilkinson said the Massey bridge would be built without tolls, mindful of the removal of tolls from the Port Mann and Golden Ears bridges that proved popular in Maple Ridge and Surrey where both parties are campaigning feverishly for the Oct. 24 election.

The B.C. Liberal government had a contract for $2.4 billion to build the Massey bridge, replacing a tunnel put in the river more than 60 years ago and now considered at risk in an earthquake. The B.C. Liberals say a new bridge will be financed out of an $8 billion “Rebuild B.C.” fund, which is in addition to existing infrastructure plans including the Langley and Vancouver rapid transit extensions now in progress.

The tunnel option could mean a delay of up to 10 years in getting a new crossing ready for use, since the Tsawwassen First Nation has opposed the plan and would likely challenge it in court due to the impact of dredging the river on Fraser River salmon, Wilkinson said. At a minimum, the tunnel option triggers a federal environmental assessment of the fish habitat impact, and if approved, the dredging and relocation of thousands of tonnes of salt-contaminated river bottom soil to create a trench for the twin tunnels.

Just before the announcement, the NDP campaign issued a statement claiming the switch would “risk major delays, risk losing federal funding and set the project back years.” Kahlon said he doesn’t know how lonh a federal fisheries review of tunnel dredging and construction would take, but the previously approved bridge would “turn Richmond into a parking lot.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC politicsBC Votes 2020

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

(Submitted by Cassidi Markus)
Snow flurries forecasted for the Okanagan this weekend

Arctic front expected to bring colder than average temperatures and snow

A health-care worker prepares to swab a man at a walk-in COVID-19 test clinic in Montreal North, Sunday, May 10, 2020, as the COVID-19 pandemic continues in Canada and around the world. (THE CANADIAN PRESS/Graham Hughes)
Interior Health records 21 new COVID-19 cases over the weekend

Thirty-six cases remain active; two people are in the hospital, one of whom is in intensive care

The Summerland Steam will play their first exhibition game of the season on Friday, Oct. 23. Unlike previous years, there will be no spectators allowed in the stands this year in an effort to slow the spread of the COVID-19 pandemic. (Brennan Phillips - Black Press)
Junior B hockey teams to play in empty arenas

Summerland Steam and other teams affected by decision to close facilities to fans

Canadian Horizons is taking steps to develop a 320-unit residential neighbourhood at 1050 Spiller Road, northeast of the City of Penticton. (Canadian Horizons photo)
Penticton Indian Band opposes Canadian Horizons development

Proposed residential development will remove the protected rights of the syilx Nation, says PIB

This picture taken in yesteryears shows how popular the Naramata public beach has been over the years.
(Naramataslow)
It does take a village to save a beach

Nearly $600K raised so far to preserve Naramata park

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

With local MLA Adam Olsen looking on, BC Greens leader Sonia Furstenau said a Green government would convert BC Ferries into a Crown corporation Wolf Depner/News Staff)
Green leader Sonia Furstenau promises to convert BC Ferries back into Crown corporation

Promise comes Monday afternoon with five days left in campaign

The Regional District of Okanagan-Similkameen is conducting a citizen survey. (Black Press file photo)
Regional District of Okanagan-Similkameen survey to conclude Nov. 1

2020 Citizen Survey results used to evaluate services

Vernon Fire Rescue Services and Vernon-North Okanagan RCMP were called to a report of an electrical fire at the emergency response centre operated by Turning Points Collaborative Society on 37th Street Sunday, Oct. 18, just before 5:30 p.m. The fire displaced shelter residents who have been set up with services at the Vernon Recreation Complex. (Roger Knox - Morning Star)
Vernon shelter residents find refuge in hotels, motels, recreation complex after fire

Electrical fire at Turning Points Collaborative Society’s emergency response centre on 37th Street

RCMP. (Phil McLachlan - Black Press Media)
Kelowna man charged after allegedly stealing senior’s car

Elderly woman’s car was stolen while she was shopping

Salmon Arm RCMP say residents have been receiving calls from fraudster claiming to be with Publishers Clearing House. (File photo)
Salmon Arm RCMP warn of Publishers Clearing House telephone scam

Police say scammer requests fee to claim sweepstakes prizes

Osoyoos Fire Department responded to reports of a vehicle engulfed in flames Sunday (Oct. 18) evening at a Lambert Court residence. (Osoyoos Fire Department)
Osoyoos Fire Department knock down car fire near home

Blaze was ‘really close’ to becoming a structure fire

Colin James put on a great show at the Comox Valley Exhibition Grounds as part of the 2019 Vancouver Island MusicFest. But his Okanagan tour for 2020 has been postponed until 2021. (Photo by Terry Farrell)
COVID-19 cancels more Okanagan concerts

The Contenders and Colin James postponed until 2021

Most Read