A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

VIDEO: New Sicamous Highway 1 bridge renderings show one less lane than promised

Mayor Terry Rysz wants to see access improvements and funding for a pedestrian bridge.

According to a recent update, the replacement for the RW Bruhn Bridge along Highway 1 won’t be the five-lane structure previously chosen by the province after much public consultation.

Following a series of engagement opportunities with Sicamous residents, including a survey, open houses and a town hall meeting, through which the public provided input on three replacement options, the Ministry of Transportation and Infrastructure announced in 2018 that the existing bridge would be replaced by a five-lane span.

Sicamous Mayor Terry Rysz was a vocal proponent for one of the other options that included a four-lane highway bridge accompanied by a smaller one at Main Street. The plan with the Main Street bridge was endorsed by the Sicamous council at the time.

Though the project is currently in the detailed design phase, recent information released by the ministry, including videos and a Winter 2021 update, shows a four-lane structure – without the second bridge at Main Street.

A ministry representative said the most recent design was selected because it will allow for the closure of the Old Spallumcheen Road intersection at the west end of the existing bridge. The closure of the intersection will improve safety for users of the highway according to the ministry.

Regarding the change from five lanes to four, the ministry said this is to reduce the impact of the project on areasidentified as culturally or archaeologically sensitive, and will also allow the existing bridge to remain in service during construction of the new span.

The ministry anticipates construction of the bridge will take three years. Tree clearing and relocation of utilities are expected to be complete this year and the project is now expected to go to tender in 2022.

Along with information on project progress and next steps, the ministry released two videos which show a 3D rendering of the bridge and the off ramp and underpass which will be used to access Old Sicamous Road and Old Spallumcheen Road. The underpass was a feature of the five-lane design which is being carried over to the new plan.

According to the ministry, the project remains on-budget: $224.5 million in funding for the project was approved in 2018, with $91 million of the total coming from the federal government.

Mayor Terry Rysz says he thinks the ministry has made up their mind about the direction the bridge project will be taking but he wants to see some features added to it. Rysz said he wants to ensure ease of access for traffic off the highway into Sicamous’ downtown commercial areas, and easy access to the west side of the Sicamous channel.

In particular, Rysz said he and the rest of the Sicamous council would be lobbying the ministry for help in building an extension of Silver Sands Road allowing another access point for drivers to get off the highway and into town.

Since the second car bridge at Main Street was removed from the plans, Sicamous’ council has been seeking help for the construction of a pedestrian suspension bridge over the channel. Rysz said the ministry referred them to an active transportation grant program, but he estimated the cost of a suspension bridge at over $5 million and was unsure how much of the grant would cover. He said a pedestrian link across the Sicamous channel is essential to the District’s plans to serve as a gateway to the Sicamous to Armstrong Rail Trail which is under construction.

Read more:Single-bridge option chosen to replace RW Bruhn Bridge

Read more: Sicamous mayor addresses Main Street bridge misinformation

Read more: Main Street bridge won’t cost district

Read more: Opinions divided on bridge options

Read more: Public favours five-lane option to replace Bruhn Bridge

While the current plan for the highway bridge shows a walkway alongside the eastbound lane of the highway, Rysz said he has concerns about the safety of the walkway and how it will tie into the rail trail. The existing bridge has a walkway which is not separated from traffic by barricades as the one in the photo is. Two vehicle collisions in recent years have forced vehicles over the walkway only to be stopped by the bridge railing itself, damaging it in both cases.

Overall, whatever design is settled on, Rysz said it is clear that the existing highway bridge must be replaced as soon as possible.



jim.elliot@saobserver.net

Like us on Facebook and follow us on Twitter

infrastructure

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Lori Jantz snapped this picture of a fight between a bald eagle and an osprey above Osoyoos Lake on Friday. (Lori Jantz photo)
Battle in the sky erupts above South Okanagan lake

Bald eagle and osprey fight mid-air in Osoyoos

This garbage bin behind a strip mall in Skaha Lake Road was set alight on Friday night at 11 p.m. The foam from firefighters can be seen on the ground. (Facebook)
Dumpster fire comes too close to Penticton seniors’ complex

One resident worries Penticton might have a fire bug

Theo's now delivering to Summerland
Penticton Greek restaurant now delivering to Summerland

Theo’s restaurant is the first to deliver food to Summerland in their ‘Squidmobile’

The Regional District of Okanagan-Similkameen will speed up the process for hospitality businesses looking to set up patios during the latest COVID-19 restrictions. Under the most recent restrictions, indoor dining is prohibited, but patio dining is allowed. (John Arendt - Summerland Review)
Regional District of Okanagan-Similkameen speeds up patio permit approval

Initiative to help hospitality businesses affected by latest COVID-19 restrictions

Firefighters responded to a house fire on Banks Crescent in Summerland on Friday afternoon. The fire began as a stovetop fire but resulted in significant damages. (John Arendt - Summerland Review)
Fire results in damage to Summerland home

Crews called on Friday, April 9 following stovetop fire

B.C. Health Minister Adrian Dix and Premier John Horgan describe vaccine rollout at the legislature, March 29, 2021. (B.C. government)
1,262 more COVID-19 infections in B.C. Friday, 9,574 active cases

Province’s mass vaccination reaches one million people

B.C. Premier John Horgan responds to questions during a postelection news conference in Vancouver, on Sunday, October 25, 2020. British Columbia’s opposition Liberals and Greens acknowledge the COVID-19 pandemic has presented huge challenges for Horgan’s government, but they say Monday’s throne speech must outline a coherent plan for the province’s economic, health, social and environmental future. THE CANADIAN PRESS/Darryl Dyck
Horgan’s NDP to bring in throne speech in B.C., Opposition wants coherent plan

Farnworth said the budget will include details of government investment in communities and infrastructure

FILE - An arena worker removes the net from the ice after the Vancouver Canucks and Calgary Flames NHL hockey game was postponed due to a positive COVID-19 test result, in Vancouver, British Columbia, in this Wednesday, March 31, 2021, file photo. As vaccinations ramp up past a pace of 3 million a day in the U.S, the NHL is in a tougher spot than the other three major North American professional sports leagues because seven of 31 teams are based on Canada. (Darryl Dyck/The Canadian Press via AP, File)
Vancouver Canucks scheduled to practice Sunday, resume games April 16 after COVID outbreak

Canucks outbreak delayed the team’s season by eight games

Two-year-old Ivy McLeod, seen here on April 9, 2021 with four-year-old sister Elena and mom Vanessa, was born with limb differences. The family, including husband/dad Sean McLeod, is looking for a family puppy that also has a limb difference. (Jenna Hauck/ Chilliwack Progress)
B.C. family looking for puppy with limb difference, just like 2-year-old Ivy

Ivy McLeod born as bilateral amputee, now her family wants to find ‘companion’ puppy for her

This illustration provided by the Centers for Disease Control and Prevention in January 2020 shows the 2019 Novel Coronavirus.[CDC]
More COVID-19 exposures reported at schools in Kelowna

Interior Health added additional schools and dates to their list of exposures

A vehicle that was driven through the wall of a parkade at Uptown Shopping Centre and into the nearby Walmart on April 9 was removed through another hole in the wall later that night. (Photo via Saanich Police Department and Ayush Kakkar)
Vehicle launched into B.C. Walmart removed following rescue of trapped workers

Crews cut new hole in parkade wall to remove vehicle safely

Four members with Divers for Cleaner Lakes and Oceans were out at Cultus Lake on March 28 and 29 hauling trash out of the waters. (Henry Wang)
PHOTOS: Out-of-town divers remove 100s of pounds of trash from Cultus Lake

Members of Divers for Cleaner Lakes and Oceans hauled out 470 pounds of trash over two days

A Salmon Arm artist worked with talented local fabricators to create an enormous set of steel bighorn sheep horns to greet visitors to Radium Hot Springs. (Village of Radium Hot Springs image)
Salmon Arm locals’ skills bring steel sheep horn sculpture to Radium

Adam Meikle and Idea 64 Projects made the towering horns a reality

Most Read