BC Ferries uses its Coastal-class ferries on the Nanaimo-Horseshoe Bay route

UPDATE: Nanaimo will keep two ferry terminals

Transportation Minister Todd Stone reverses course after objections from Vancouver Island MLAs Michelle Stilwell and Don McRae

Transportation Minister Todd Stone has backed away from a proposal by BC Ferries that it should consolidate its two Nanaimo ferry terminals, after objections from B.C. Liberal MLAs on both sides of the route.

Stone said Tuesday that BC Ferries should consider whether it still needs both ferry terminals at Nanaimo, a legacy of the NDP government’s decision in the 1990s to build Duke Point. BC Ferries calculates that its Nanaimo runs have higher costs and lower ridership than the main Tsawwassen-Swartz Bay run that serves Victoria.

But on Wednesday, Stone ruled out that possibility.

“I indicated yesterday that while we weren’t endorsing or supporting the idea, it may be worthy of consideration,” Stone said by phone from Regina Wednesday. “Over the last 24 hours, I’ve had some very good conversations with my Island colleagues, Don McRae (Comox Valley) and Michelle Stilwell (Parksville-Qualicum) as well as my pariliamentary secretary Jordan Sturdy (West Vancouver-Sea to Sky). They’ve made some very strong and eloquent arguments to me that they don’t believe closing one of the two terminals at Nanaimo would be a good thing, not just for the economy of Nanaimo, but potentially the economy of the mid-Island.”

However, the completion of the South Fraser Perimeter Road through Delta and expensive refits required at the Horseshoe Bay ferry terminal in North Vancouver could result in a shift of some mainland-to-Nanaimo ferry traffic to the Tsawwassen terminal in the coming years.

BC Ferries has released a new major route strategy that proposes ending the Horseshoe Bay-Nanaimo run and putting the traffic on the Tsawwassen-Duke Point route, which has had sailings cut due to low usage.

Stone also ruled out BC Ferries’ suggestion to consider a passenger-only ferry from Departure Bay in downtown Nanaimo to Horseshoe Bay.

Horseshoe Bay has congestion problems on the water as well as on land, where vehicles line up along the highway before stacking up in a two-level “transfer deck” to board the ship. That dock structure is due for replacement at an estimated cost of $200 million.

Horseshoe Bay terminal also serves the Sunshine Coast via Langdale and a third run to Bowen Island with smaller vessels. BC Ferries CEO Mike Corrigan compares it to an airport with only one runway, with ferries lining up to a terminal that can only load and unload one at a time.

Tsawwassen has multiple berths that can handle simultaneous loading and unloading.

Both Stone and Corrigan emphasized that BC Ferries has to look beyond tinkering with under-used routes to keep fare increases in check.

“This is a longer-term project,” Corrigan told CKNW radio. “It’s not something we’re going to do overnight.”

 

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

LETTER: Plants help enhance Summerland

Summerland Public Works has added to beautification

Ryga Arts Festival to include live events

Arts festival in Summerland will feature live and online performances

UPDATE: Wildfire between Summerland and Penticton now ‘under control’

Emergency vehicles are at the scene near Sage Mesa, evacuation centre set up in Penticton

South Okanagan sees increase in real estate activity

More single family homes sold at higher prices when compared with a year ago

Penticton Peach Fest headliners moved to 2021

Artists include Glass Tiger, Simply Queen, Jess Moskaluke and Honeymoon Suite

B.C. would not send students back to school if there was ‘overwhelming risk’: Horgan

Plan has left many parents across the province worried about their children’s safety

Canucks blank Wild 3-0, take series lead in penalty-filled NHL qualifying clash

Jacob Markstrom stops 27 shots to lead Vancouver past Minnesota

VIDEO: A B.C business used robots to bring down concrete walls

Walco Industries is the only firm on Vancouver Island to use specialized robots for hydro-demolition

As CERB winds down, labour group asks Liberals to rethink EI

The government estimates four million people will be moved onto EI after CERB ends

Highway 3 closed south of Princeton after vehicle incident

There is currently no detour, Drive BC stated, but crews are on scene

North Okanagan man chains himself to tree in protest of construction

Crews began work clearing space for a new facility Thursday, Aug. 6

Search crews en route to vehicle over Coquihalla Highway embankment

Incident on northbound side of highway near Great Bear Snowshed: SAR

Fire causes significant damage to West Kelowna home

The fire was first reported at 10:30 a.m. on Aug. 6.

Most Read