Construction continues on the Site C dam project in northeastern B.C., with an estimated cost of more than $10 billion and completion expected in 2024. (B.C. Hydro)

NDP looks for ways to rein in B.C. Hydro rates

Internal review looks for cost cutting, new revenue sources

The B.C. NDP government’s first effort to slow down B.C. Hydro rates was rejected by regulators, and now they are trying again.

Energy Minister Michelle Mungall announced a two-part review of the provincially owned electrical utility Monday, after dam construction and deferred debt forced a three per cent rate increase in April. That followed a 3.5 per cent increase in 2017, part of the B.C. Liberal government’s 10-year rate plan.

RELATED: NDP’s BC Hydro rate freeze refused

Now an internal ministry team will seek ways to “refresh” the previous government’s rate plan, which was announced in 2013 and included increases totalling up to 28 per cent over five years.

RELATED: BC Hydro rate plan maps big increases

Premier John Horgan campaigned last year on a promise to freeze B.C. Hydro rates while a review of accumulated debt and major projects like the Site C dam on the Peace River were conducted. His government reluctantly decided to continue Site C, with cost estimated at more than $10 billion.

The B.C. Utilities Commission then refused B.C. Hydro’s application for a rate freeze in February.

The government intends to appoint an expert panel later this year. Its role is to “ensure B.C. Hydro is well positioned to maximize opportunities flowing from shifts taking place in the global and regional energy sectors, technological change and climate action,” according to a ministry statement.

Just Posted

Living life to the fullest with Alzheimer’s – an Okanagan couple’s story

Stella Adams and Willi Brombach are making their way through the uncharted waters of Alzheimer’s

Summerland’s solar power array on schedule

Solar project nearing public consultation stage

Growth in many ways for Summerland

Looking back on 2018 and looking forward to 2019 with Mayor Toni Boot

Video: New Penticton studio is a playground for creative types

We toured Penticton’s newest creator space

Hang glider pilot rescued from Pincushion Mountain

Pilot was able to help guide rescue crews to her location

B.C. storm totals $37M in insured damages

The December storm wreaked havoc on B.C.’s south coast

Chiasson nets shootout winner as Oilers edge Canucks 3-2

Edmonton moves one point ahead of Vancouver

B.C. chief says they didn’t give up rights for gas pipeline to be built

Hereditary chief: no elected band council or Crown authority has jurisdiction over Wet’suwet’en land

Condo rental bans may be on way out with B.C. empty home tax

Many exemptions to tax, but annual declarations required

UPDATE: B.C. boy, aunt missing for three days

The pair are missing from Kamloops

Daredevil changes game plan to jump broken White Rock pier

Brooke Colby tells council daredevil event would help boost waterfront business

Liberal bows out of byelection after singling out Jagmeet Singh’s race

Karen Wang says she made comments online that referenced Singh’s cultural background

Truck hauling compressed gas for ‘virtual pipeline’ crashes on B.C. highway

Driver charged and highway closed for nine hours - containers did not rupture

Most Read